Units of competency – cpccbc5002a – monitor costing systems on medium

 Units of competency – CPCCBC5002A – Monitor costing systems on medium rise building and construction projects
 

  i would like to have the answers in Summary form notes  for this unit CPCCBC5002A Monitor Costing System starts from section

 ————————

  

19. You have to prepare a Construction Programme for a complex multi level project where activities can logically be inprogress, concurrently on each level.

What specific major advantages are there in preparing a manual hand written logic programme, showing the activity logic connections and durations. Before attempting to data entry them into a computer generated programme like Microsoft Project?

List and explain briefly two (2) advantages

20. What is the major advantage to the Management of a construction project to know what activities in the construction program are non-critical and the amount of total float time for each activity

List and describe the advantages

21. If you add up all the total floats (stacks) of separate chains of non critical activities the total is of vital information for managing the project to finish in the shortest time

True of False?

22. During the progression of a commercial construction project inevitably actual progress is delayed behind the planned progress from the construction programme. Once identified by regular monitoring, what options are available for site management to ‘make up’ lost time, to prevent financial loss consequences from Liquidated Damages in the head contract? 

Describe in detail an action you can initiate to get back on programme.

23. When drafting the initial Construction Programme for a commercial project. What information/data should be considered to allow for anticipated delays? List four possible issues.

· Seasonal inclement weather:

· Sub-contractor delays:

· Material supplier delays:

· Industrial site issues:

24. Site management staff during the construction process are constantly required to manage the finances of the project by using ‘Cost Benefit’ analysis processes

For example, to overcome identified loss time on a project one option is utilising existing manpower resources to work additional daily hours on ‘overcome penalty rates’ to make up lost time.

What offsetting benefits can be justified to balance out the additional overtime costs?

List three (3)

25. When preparing the initial Construction Programme the programmer has to take into account some legal requirements included in the Head Contract

List three (3) specific generic commercial contract clauses that would be included.

26. Building Consultants engaged by the Architect on a commercial Construction Project are involved in the documentation of services in the Design phase. Identify circumstances in which these Building Consultants would be involved during the construction of a commercial project. List two (2) circumstances which may affect the Programme.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more