Question : Objective 20.6 1) A grouping of all the different types of : 1217089

 

Objective 20.6

 

1) A grouping of all the different types of equipment used to make a given product is referred to as:

A) total quality management

B) materials requirements planning

C) manufacturing cells

D) economic order quantity

2) The time required to get equipment, tools, and materials ready to start production is referred to as:

A) setup time

B) manufacturing lead time

C) pass-through time

D) None of these answers is correct.

 

3) The time from when an order is received by manufacturing until it becomes a finished good is referred to as:

A) work-in-process time

B) manufacturing lead time

C) pass-through time

D) None of these answers is correct.

 

4) All of the following are potential financial benefits of just-in-time EXCEPT:

A) lower investments in inventories

B) lower investments in plant space for inventories

C) reducing the risk of obsolescence

D) reducing manufacturing lead time

 

5) A system that comprises a single database that collects data and feeds it into software applications supporting all of a company’s business activities is known as a(n):

A) economic order quantity (EOQ) system

B) enterprise requirements planning (ERP) system

C) just-in-time (JIT) system

D) material requirements planning (MRP) system

6) One DISADVANTAGE of an enterprise resource planning (ERP) system is:

A) the use of standard costing systems is not allowed

B) these systems are not in accordance with Generally Accepted Accounting Principles (GAAP)

C) the systems must often be customized to fit the strategic needs of the user

D) the systems increase lead times when purchasing material from a supplier

 

7) A financial benefit of a just-in-time system is that inventory carrying costs are reduced.

 

8) In a just-in-time system, suppliers are selected primarily on the basis of their ability to provide materials and products at the lowest possible price.

 

9) An Enterprise Resource Planning (ERP) System comprises a single database that collects data and feeds it into software applications supporting all of a company’s business activities.

 

10) The Jarvis Corporation produces bucket loader assemblies for the tractor industry. The product has a long term life expectancy. Jarvis has a traditional manufacturing and inventory system. Jarvis is considering the installation of a just-in-time inventory system to improve its cost structure. In doing a full study using its manufacturing engineering team as well as consulting with industry JIT experts and the main vendors and suppliers of the components Jarvis uses to manufacture the bucket loader assemblies, the following incremental cost-benefit relevant information is available for analysis:

 

The Jarvis cost of investment capital hurdle rate is 15%.

One time cost to rearrange the shop floor to create the manufacturing cell workstations is $275,000.

One time cost to retrain the existing workforce for the JIT required skills is $60,000.

Anticipated defect reduction is 40%. Currently there is a cost of quality defect assessment listed as $150,000 per year.

The setup time for each of the existing functions will be reduced by 67%. Currently the forecast for setup costs are $225,000 per year.

Jarvis will expect to save $200,000 per year in carrying costs as a result of having a lower inventory.

 

The suppliers will require a 15% premium over the current level of prices in order to position themselves to supply the material on a smaller and more frequent schedule. Currently the materials purchases are $1,500,000 per year.

 

Required:

Determine whether it is in the best interest of Jarvis Corporation to install a JIT system.

 

 

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more