Question : 21) The materials handling activity-cost driver rate is: A) $2.00 : 1217195

 

21) The materials handling activity-cost driver rate is:

A) $2.00

B) $20.00

C) $0.50

D) $5.00

22) The inspections activity-cost driver rate is:

A) $0.50

B) $2.00

C) $20.00

D) $5.00

 

23) During October, Mayan produced 700,000 regular ceramic paperweights and Mayan’s production manager counted 2,000 orders; 1,000 maintenance-hours; 2,000 setups; and 2,000 inspections for the regular product line. For October, Mayan’s controller assigned ________ indirect costs to the regular product line.

A) $43,000

B) $25,000

C) $34,000

D) None of these answers are correct.

Answer the following questions using the information below:

 

Nichols, Inc., manufactures remote controls. Currently the company uses a plant-wide rate for allocating manufacturing overhead. The plant manager believes it is time to refine the method of cost allocation and has the accounting department identify the primary production activities and their cost drivers:

 

ActivitiesCost driverAllocation Rate

Material handlingNumber of parts$2 per part

AssemblyLabor hours$20 per hour

InspectionTime at inspection station$3 per minute

 

The current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $200 per labor hour.

 

24) What are the indirect manufacturing costs per remote control assuming the traditional method is used and a batch of 500 remote controls are produced? The batch requires 1,000 parts, 10 direct manufacturing labor hours, and 15 minutes of inspection time.

A) $2,000.00 per remote control

B) $0.25 per remote control

C) $2.00 per remote control

D) $4.00 per remote control

 

25) What are the indirect manufacturing costs per remote control assuming an activity-based-costing method is used and a batch of 50 remote controls are produced? The batch requires 100 parts, 6 direct manufacturing labor hours, and 2.5 minutes of inspection time.

A) $4.00 per remote control

B) $6.55 per remote control

C) $24.00 per remote control

D) $327.50 per remote control

26) What are the indirect manufacturing costs per remote control assuming an activity-based-costing method is used and a batch of 100 remote controls are produced? The batch requires 500 parts, 10 direct manufacturing labor hours, and 5 minutes of inspection time.

A) $12.15 per remote control

B) $1215 per remote control

C) $24.30 per remote control

D) $48.60 per remote control

Answer the following questions using the information below:

 

Gregory Enterprises has identified three cost pools to allocate overhead costs. The following estimates are provided for the coming year:

 

Cost PoolOverhead CostsCost driverActivity level

Supervision of direct labor$320,000Direct labor-hours800,000

Machine maintenance$120,000Machine-hours960,000

Facility rent$200,000Square feet of area100,000

Total overhead costs$640,000

 

The accounting records show the Mossman Job consumed the following resources:

 

Cost driverActual level

Direct labor-hours200

Machine-hours1,600

Square feet of area50

 

27) If Gregory Enterprises uses the three activity cost pools to allocate overhead costs, what are the activity-cost driver rates for supervision of direct labor, machine maintenance, and facility rent, respectively?

A) $0.60 per dlh, $0.025 per mh, $0.80 per sq ft

B) $1.25 per dlh, $0.25 per mh, $0.50 per sq ft

C) $0.40 per dlh, $0.05 per mh, $0.20 per sq ft

D) $0.40 per dlh, $0.125 per mh, $2 per sq ft

28) Using the three cost pools to allocate overhead costs, what is the total amount of overhead costs to be allocated to the Mossman Job?

A) $200

B) $380

C) $675

D) $170

 

Answer the following questions using the information below:

 

Velshi Printers has contracts to complete weekly supplements required by forty-six customers. For the year 2010, manufacturing overhead cost estimates total $840,000 for an annual production capacity of 12 million pages.

 

For 2010 Velshi Printers has decided to evaluate the use of additional cost pools. After analyzing manufacturing overhead costs, it was determined that number of design changes, setups, and inspections are the primary manufacturing overhead cost drivers. The following information was gathered during the analysis:

 

Cost poolManufacturing overhead costsActivity level

Design changes$ 120,000300 design changes

Setups640,0005,000 setups

Inspections80,0008,000 inspections

Total manufacturing overhead costs$840,000

 

During 2010, two customers, Money Managers and Hospital Systems, are expected to use the following printing services:

 

ActivityMoney ManagersHospital Systems

Pages60,00076,000

Design changes100

Setups2010

Inspections3038

 

29) Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and inspections cost pools?

A) $400 per change, $128 per setup, $10 per inspection

B) $360 per change, $320 per setup, $6.40 per inspection

C) $168 per change, $538 per setup, $42 per inspection

D) $286 per change, $152 per setup, $20 per inspection

 

30) Using the three cost pools to allocate overhead costs, what is the total manufacturing overhead cost estimate for Money Managers during 2010?

A) $13,700

B) $6,500

C) $6,860

D) $10,192

 

 

 

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more