Need tutoring | Accounting homework help

In this project, you will understand the importance of the control function in manufacturing. You will compare actual performance with desired production standards, measure progress toward company goals, and address deviations in performance through corrective action.

Outcome Met by Completing This Assignment

· Develop measures and assess outcomes against plans and standards to improve organizational effectiveness.

How to Set Up the Paper

· Create a double-spaced Word or Rich Text Format (RTF) document using 12-point font.  PDF documents are not acceptable. The final product will be 
5-6 pages long, excluding the title and reference pages.   

· Create a title page with a title, date, course number and section, your name, and the instructor’s name.

Scenario

The following chart displays the results of the first year’s production of the Lacks Tracks Cycles, an electric-powered chopper-style motorcycle produced by Lacks Tracks Cycles to compete with Harley-Davidson’s Electra Glide. The metrics table below was created from data supplied by Lacks Tracks Cycles five (5) plants. The purpose of the table is to provide data for management to decide what controls and actions are needed to increase production efficiency.   

You recently joined the Lacks Tracks Cycles’ headquarters staff as a quality assurance associate. Your manager requested you analyze the first year’s motorcycle production results.  Management will use this information to evaluate and improve overall production efficiency.

Lacks Tracks Cycles is known for producing high-quality products at reasonable prices. They plan to compete against Harley’s top-end model by developing superior production efficiency, allowing them to price significantly below Harley Davidson’s Electra Glide model.   

The chart below lists the desired production standards and the actual production metrics for each stage of the electric motorcycle’s manufacturing process that must be completed to determine the overall production efficiency at each of Lacks Tracks Cycles’ five (5) production facilities.

A comparison of the production standard to the actual production outcomes using all the relevant metrics allows management to determine which of its facilities is the most efficient producer of the electric motorcycle. This knowledge will help Lacks Tracks Cycles’ management team to determine what controls need to be put into place at their various production plants to match the production efficiency of their most efficient plant. More efficiency means higher production at lower per unit (cycle) costs. 

 
Metrics

Standard

Maryland

Delaware

New Jersey

Texas

Alaska

Total Cost to Manufacture (per unit)

13,500

15,250

14,100

12,750

16,000

14,250

Manufacturing Cycle Time (time to complete a single vehicle – in hours)

15

18

16

12

12

14

Yield (percentage of cars produced to specifications the first time without rework)

98%

99%

97%

96.50%

97.50%

95.15%

Defective Rate/Recall Rate

2%

1%

3%

3.50%

2.50%

4.85%

Scrap Rate

2%

3%

4%

2.50%

2%

1.90%

Average Production Downtime

0.50%

1%

1.50%

0.75%

0.50%

0.75%

Training Time (hours per month)

8

6

3

5

7

4

Shipping Problems/Damage (per 10,000 units)

1

2

4

2

1

3

Safety Incident per Employee

1.50%

2.25%

0.75%

3%

2%

1.90%

Number of units manufactured per year

45,000

43,000

27,000

42,500

48,000

45,500

Utilization Rate (Capacity rate facility is utilizing during available production time)

81.82%

78.18%

49.09%

77.27%

87.27%

82.73%

Use only the BOLDED centered and left-justified headings to write your paper. 

                                                                        Introduction

· Write an Introduction paragraph.
 The introduction paragraph is the first paragraph of the paper and will describe to the reader the intent of the paper, explaining the main points covered in the paper.  This intent should be understood before reading the remainder of the paper so the reader knows exactly what is being covered in the paper. The introduction is often written after the paper is completed. (Use in-text citations, as needed, and include the references in the Reference section.)

The body of the paper will cover the following:

                                                                          Controls

· Explain what control means in a business setting. (Use headings below and in-text citations as required.)

· Explain why Lacks Tracks must be concerned with the actual production metrics at its plants. (Use headings below and in-text citations as required.)

Control Defined 

Importance of Lacks Tracks Production Metrics

                                                                 Standard Specifications

· Compare the metrics table standards to the performance outcomes at the five (5) plants and explain your findings for each plant. (Use headings below and in-text citations, as appropriate.)

· Identify the four (4) most important and common deviations from the standards among the plants and explain why this data is important to Lacks Tracks management. (Use headings below and in-text citations, as appropriate.)  

· Using course materials, identify and explain two (2) types of controls that could be used by Lacks Tracks management to attempt to correct the deviations from standards at its plants. (Use headings below and in-text citations, as appropriate.)  

Metrics Table Plant Performance Comparisons 

Four Most Significant Deviations

Two Recommended Controls 

                                                              Total Quality Management 

· Explain why implementing a Total Quality Management (TQM) program could improve operational efficiency at Lacks Tracks. (Use in-text citations, as appropriate.)

                                                                          Conclusion

Create a concluding paragraph. The conclusion paragraph highlights the major findings covered in the paper. (Use in-text citations, as appropriate.)

                                                                         References

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more