Question : 51. The Nite Lite Factory has determined that its budgeted factory : 1233959

 

51. The Nite Lite Factory has determined that its budgeted factory overhead budget for the year is $6,750,000 and budgeted direct labor hours are 5,000,000. Using the single plantwide factory overhead rate based on direct labor hours, determine the factory overhead rate for the year. 
A. $1.35
B. $1.20
C. $.74
D. cannot be determined

52. The Nite Lite Factory has determined that its budgeted factory overhead budget for the year is $6,750,000 and budgeted direct labor hours are 5,000,000. If the actual direct labors for the period are 180,000 and direct labor hours is the allocation base, the factory overhead allocation using the single plantwide factory overhead rate is? 
A. $375,000
B. $133,333
C. $243,000
D. cannot be determined

53. Nite Lite Factory produces two similar products – small lamps and desk lamps. The total plant overhead budget is $640,000 with 400,000 estimated direct labor hours. It is further estimated that small lamp production will have 275,000 direct labor hours and desk lamp production will require 125,000 direct labor hours. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will be allocated to the small lamp production if the actual direct hours for the period is 290,000? 
A. $220,690
B. $400,000
C. $440,000
D. $464,000

54. Nite Lite Factory produces two similar products – small lamps and desk lamps. The total plant overhead budget is $640,000 with 400,000 estimated direct labor hours. It is further estimated that small lamp production will have 275,000 direct labor hours and desk lamp production will require 125,000 direct labor hours. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will be allocated to the desk lamp production if the actual direct hours for the period is 121,000? 
A. $220,690
B. $200,000
C. $193,600
D. $279,000

55. Nite Lite Factory produces two similar products – small lamps and desk lamps. The total plant overhead budget is $640,000 with 400,000 estimated direct labor hours. It is further estimated that small lamp production will use 3 direct labor hours for each unit and desk lamp production will require 1.25 direct labor hours for each unit. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will be allocated to the desk lamp production if the actual production for the period is 121,000 units? 
A. $151,250
B. $242,000
C. $580,800
D. $363,000

56. Nite Lite Factory produces two similar products – small lamps and desk lamps. The total plant budget is $640,000 with 400,000 estimated direct labor hours. It is further estimated that small lamp production will use 3 direct labor hours for each unit and desk lamp production will require 1.25 direct labor hours for each unit. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will be allocated to the small lamp production if the actual production for the period is 108,000 units? 
A. $518,400
B. $324,000
C. $580,800
D. $363,000

57. The Southwest Leather Company manufactures leather handbags (H) and moccasins (M). For simplicity reasons, they have decided to use the single plantwide factory overhead rate method to allocate factory overhead. The factory overhead estimated per unit together with direct materials and direct labor will help determine selling prices. Calculate the amount of factory overhead to be allocated to each unit using direct labor hours.
Handbags = 60,000 units, 2 hours of direct labor
Moccasins= 40,000 units, 3 hours of direct labor
Total Budgeted factory overhead cost = $360,000 
A. (H) $1.50 , (M) $1.50
B. (H) $3.00, (M) $4.50
C. (H) $3.00, (M) $3.00
D. (H) $2.40, (M) $2.40

58. The Nite Lite Factory produces two products – small lamps and desk lamps. It has two separate departments – finishing and production. The overhead budget for the finishing department is $550,000, using 500,000 direct labor hours. The overhead budget for the production department is $400,000 using 80,000 direct labor hours. If the budget estimates that a small lamp will require 2 hours of finishing and 1 hours of production, how much factory overhead will be allocated to each unit of small lamps using the multiple production department factory overhead rate method with an allocation base of direct labor hours? 
A. $6.33
B. $4.91
C. $5.00
D. $7.20

59. The Nite Lite Factory produces two products – small lamps and desk lamps. It has two separate departments – finishing and production. The overhead budget for the finishing department is $550,000, using 500,000 direct labor hours. The overhead budget for the production department is $400,000 using 80,000 direct labor hours. If the budget estimates that a desk lamp will require 1 hours of finishing and 2 hours of production, how much factory overhead will be allocated to each unit of desk lamps using the multiple production department factory overhead rate method with an allocation base of direct labor hours? 
A. $11.10
B. $4.91
C. $5.00
D. $10.00

60. The Nite Lite Factory produces two products – small lamps and desk lamps. It has two separate departments – finishing and production. The overhead budget for the finishing department is $550,000, using 500,000 direct labor hours. The overhead budget for the production department is $400,000 using 80,000 direct labor hours. If the budget estimates that a small lamp will require 2 hours of finishing and 1 hours of production, what is the total amount of factory overhead to be allocated to small lamps using the multiple production department factory overhead rate method with an allocation base of direct labor hours, if 75,000 units are produced? 
A. $400,000
B. $540,000
C. $550,000
D. $368,250

 

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more