101.
Activity
Activity Cost
Preventive maintenance
$2,000
Warranty work
750
Product design
1,000
Prototype inspection
500
Emergency maintenance
1,250
Rework
750
Scrap processing
500
Processing returned products
750
Machine operator training
1,500
Process audits
500
From the above Schedule of Activity Cost, determine the nonvalue-added costs. A. $12,000B. $ 9,000C. $36,000D. $16,000
102.
Activity
Activity Cost
Preventive maintenance
$2,000
Warranty work
750
Product design
1,000
Prototype inspection
500
Emergency maintenance
1,250
Rework
750
Scrap processing
500
Processing returned products
750
Machine operator training
1,500
Process audits
500
From the above Schedule of Activity Cost, determine the value-added costs. A. $96,000B. $72,000C. $160,000D. $120,000
103.
Activity
Activity Cost
Preventive maintenance
$2,000
Warranty work
750
Product design
1,000
Prototype inspection
500
Emergency maintenance
1,250
Rework
750
Scrap processing
500
Processing returned products
750
Machine operator training
1,500
Process audits
500
From the above Schedule of Activity Cost, determine the prevention costs. A. $96,000B. $72,000C. $88,000D. $128,000
104.
Activity
Activity Cost
Preventive maintenance
$2,000
Warranty work
750
Product design
1,000
Prototype inspection
500
Emergency maintenance
1,250
Rework
750
Scrap processing
500
Processing returned products
750
Machine operator training
1,500
Process audits
500
From the above Schedule of Activity Cost, determine the appraisal costs. A. $48,000B. $72,000C. $40,000D. $32,000
105.
Activity
Activity Cost
Preventive maintenance
$2,000
Warranty work
750
Product design
1,000
Prototype inspection
500
Emergency maintenance
1,250
Rework
750
Scrap processing
500
Processing returned products
750
Machine operator training
1,500
Process audits
500
From the above Schedule of Activity Cost, determine the internal failure costs. A. $48,000B. $72,000C. $40,000D. $32,000
106.
Activity
Activity Cost
Preventive maintenance
$2,000
Warranty work
750
Product design
1,000
Prototype inspection
500
Emergency maintenance
1,250
Rework
750
Scrap processing
500
Processing returned products
750
Machine operator training
1,500
Process audits
500
From the above Schedule of Activity Cost, determine the external failure costs. A. $72,000B. $88,000C. $32,000D. $40,000
107. The local college is aggressively working in reducing the time that a student needs to enroll for each semester. All except one of the following changes is helping in their efforts. A. Counselors are specializing in common degree plans.B. One application is good at the Community college and at the transferring University.C. A one stop area includes registration, admissions, advising, and ID’s. Each working closely with each other.D. Reduce the number of degrees being offered.
108. The college would like to increase enrollment by following the just-in-time principle by streamlining the enrollment process. Which of the following would not fall in line with the college goal? A. reduce the requirements necessary to enroll.B. relocate counselors, academic advisors, and financial aid specialists for a major to a central location.C. train counselors, academic advisors, and financial aid specialists to serve like majors.D. crosstrain counselors, academic advisors, and financial aid specialists.
109. Which of the following statements is correct? A. Costs of controlling quality include prevention and appraisal costsB. Costs of failing to control quality include internal and external failure costsC. A and B are both correctD. A and B are both incorrect.
110. All of the following except one are examples of prevention costs A. preventive maintenanceB. operator trainingC. design engineeringD. testing activities
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more