Question : Objective 11.8 1) Top management faces a persistent challenge to make : 1211774

 

Objective 11.8

 

1) Top management faces a persistent challenge to make sure that the performance evaluation model of lower level managers is ________.

A) focused on short-term performance

B) based solely on quantitative factors

C) consistent with the decision model

D) based solely on qualitative factors

2) Performance evaluation focuses on responsibility centers for a specific period, not on projects or individual items of equipment over their useful lives.

 

3) How can conflicts arise between the decision model and the performance evaluation model used to evaluate managers? Provide an example of this type of conflict.

 

Objective 11.A

 

1) Linear programming is a tool that maximizes total contribution margin of a mix of products with multiple constraints.

 

2) Which of the following is an assumption of linear programming?

A) Average variable costs remain constant throughout the year.

B) Opportunity costs are irrelevant in decision making.

C) Few sunk costs are relevant in decision making.

D) All costs are either variable or fixed for a single cost driver.

 

3) In linear programming, the goals of management are expressed in ________.

A) an objective function

B) constraints

C) operating policies

D) business functions

4) A mathematical inequality or equality that must be appeased is known as a(n) ________.

A) objective function

B) constraint

C) operating policy

D) business function

5) Computer Products produces two keyboards, Regular and Special. Regular keyboards have a unit contribution margin of $128, and Special keyboards have a unit contribution margin of $720. The demand for Regulars exceeds Computer Product’s production capacity, which is limited by available machine-hours and direct manufacturing labor-hours. The maximum demand for Special keyboards is 80 per month. Management desires a product mix that will maximize the contribution toward fixed costs and profits.

 

Direct manufacturing labor is limited to 1,600 hours a month and machine-hours are limited to 1,200 a month. The Regular keyboards require 20 hours of labor and 8 machine-hours. Special keyboards require 34 labor-hours and 20 machine-hours.

 

Let R represent Regular keyboards and S represent Special keyboards. The correct set of equations for the keyboard production process is ________.

A) Maximize:$128R + $720S

Constraints:

Labor-hours:20R + 34S ≤ 1,600

Machine-hours:8R + 20S ≤ 1,200

Special:S ≤ 80

S ≥ 0

Regular:R ≥ 0

B) Maximize:$128R + $720S

Constraints:

Labor-hours:20R + 34S ≥ 1,600

Machine-hours:8R + 20S ≥≤ 1,200

Special:S ≥ 80

S ≥ 0

Regular:R ≥ 0

C) Maximize:$720S + $128R

Constraints:

Labor-hours:20R + 8S ≤ 1,600

Machine-hours:34R + 20S ≤ 1,200

Special:S ≤ 80

S ≥ 0

Regular:R ≥ 0

D) Maximize:$128R + $720S

Constraints:

Labor-hours:20R + 34S ≤ 1,600

Machine-hours:8R + 20S ≤ 1,200

Special:S ≥ 80

S ≤ 0

Regular:R ≤ 0

 

6) In linear programming, a constraint is a mathematical inequality or equality that must be satisfied by the variables in a mathematical model.

 

7) Local Steel Construction Company produces two products, steel and wood beams. Steel beams have a unit contribution margin of $200, and wood beams have a unit contribution margin of $150. The demand for steel beams exceeds Local Steel Construction Company’s production capacity, which is limited by available direct labor and machine-hours. The maximum demand for wood beams is 90 per week. Management desires that the product mix should maximize the weekly contribution toward fixed costs and profits.

 

Direct manufacturing labor is limited to 3,000 hours a week and 1,000 hours is all that the company’s outdated machines can run a week. The steel beams require 120 hours of labor and 60 machine-hours. Wood beams require 150 labor hours and 120 machine-hours.

 

Required:

Formulate the objective function and constraints necessary to determine the optimal product mix.

 

 

 

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more