Question : Answer the following questions using the information below: Whitman Printing : 1217196

 

Answer the following questions using the information below:

 

Whitman Printing has contracts to complete weekly supplements required by forty-six customers. For the year 20X5, manufacturing overhead cost estimates total $840,000 for an annual production capacity of 12 million pages.

 

For 2010 Whitman Printing decided to evaluate the use of additional cost pools. After analyzing manufacturing overhead costs, it was determined that number of design changes, setups, and inspections are the primary manufacturing overhead cost drivers. The following information was gathered during the analysis:

 

Cost pool              Manufacturing overhead costs              Activity level

Design changes              $ 120,000              200 design changes

Setups              640,000              4,000 setups

Inspections              80,000              16,000 inspections

Total manufacturing overhead costs              $840,000

 

During 2010, two customers, Money Managers and Hospital Systems, are expected to use the following printing services:

 

Activity              Money Managers              Hospital Systems

Pages              60,000              76,000

Design changes              10              2

Setups              20              10

Inspections              30              38

 

31) Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and inspections cost pools?

A) $600 per change, $160 per setup, $5.00 per inspection

B) $500 per change, $400 per setup, $7.50 per inspection

C) $420 per change, $210 per setup, $52.50 per inspection

D) $666 per change, $250 per setup, $8.00 per inspection

 

32) Using the activity-cost driver rates determined in the previous question, what is the manufacturing overhead cost estimate for Hospital Systems during 2010?

A) $6,227.50

B) $2,990.00

C) $4,136.00

D) $6,825.00

 

33) Availability of reliable data and measures should be considered when choosing a cost-allocation base.

34) When designing a costing system, it is easiest to calculate per-unit costs first, and then total costs.

 

35) ABC systems attempt to trace more costs as indirect costs.

 

36) ABC systems create heterogeneous cost pools linked to different activities.

 

37) ABC systems seek a cost allocation base that has a cause-and-effect relationship with costs in the cost pool.

 

38) For service organizations, activity-based cost systems may be used to clarify appropriate cost assignments.

 

39) For each of the following activities identify an appropriate activity-cost driver.

 

a.machine maintenance

b.machine setup

c.quality control

d.material ordering

e.production scheduling

f.warehouse expense

g.engineering design

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more