Stanford rosenberg computing | Social Science homework help

9.11 Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal Digital Assistant (PDA). The tasks, task times, and immediate predecessors for the tasks are as follows:

Task                Time               Immediate Processor

            A                     12                   

            B                     15                    A

            C                     8                      A

            D                     5                      B,C

            E                      20                    D

 

 

 

Rosenberg’s goal is to produce 180 PDAs per hour.

 a) What is the cycle time?

b) What is the theoretical minimum for the number of workstations that Rosenberg can achieve in this assembly line?

c) Can the theoretical minimum actually be reached when workstations are assigned?

 

 9.13 Sue Helms Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows:

 

Task                Time               Immediate Predecessors

A                     10                   

            B                     12                    A

            C                     8                      A,B

            D                     6                      B,C

            E                      6                      C

            F                      6                      D,E

 

 

a) What is the theoretical minimum for the smallest number of workstations that Helms can achieve in this assembly line?

b) Graph the assembly line and assign workers to workstations. Can you assign them with the theoretical minimum?

 c) What is the efficiency of your assignment?

 

9.15 The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 10 minutes.

 

 

 

Activity           Activity Description              Immediate Predecessors                   Time  

A                     Attach wheels to tub                                                                      5

B                     Attach motor to lid                                                                       1.5

C                     Attach battery pack                            B                                             3

D                     Attach safety cutoff                           C                                             4

E                      Attach filters                                       B                                             3

F                      Attach lid to tub                                 A, E                                         2

G                     Assemble attachments                                                                               3

H                     Function test                                       D, F, G                                    3.5

I                       Final inspection                                   H                                             2

J                       Packing                                               I                                               2

 

a) Draw the appropriate precedence diagram for this production line.

b) Assign tasks to workstations and determine how much idle time is present each cycle.

c) Discuss how this balance could be improved to 100%.

d) What is the theoretical minimum number of workstations?

 

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more