Deliverable 4 – creating an internal assessment survey (revision)

Here are the original instructions..

Competencies

Differentiate the key assessment metrics in achieving an operational project plan.

Instructions

Presently, your multinational organization uses steel at locations across the U.S. and globally with operations in Mexico, Russia, India, and China. Your boss is tasked with developing a global Request for Proposal (RFP) for gathering and comparing steel suppliers. In preparation for his RFP, he has tasked you with building an internal data collection tool to identify key questions to include within the RFP. The purpose of your survey is to identify all key information that is needed for the RFP, and the data collection tool will be sent to managers across the U.S. and globe. The data collection tool is a survey administered through email. Furthermore, the tool must contain a maximum of 10 questions and include the following:

  • Cost
  • Volume
  • Locations
  • Safety

Your job is to develop the project plan for the execution of the data collection tool. The project plan needs to include milestones, key events associated with creating an RFP, and corresponding dates. The time allotment from start to finish for this project by your boss is three months. Additionally, standard templates need to be built that support the project plan, including an action list, meeting minutes, and a risk management tool.

I need this assessment survey fixed. I have uploaded the assignment that I put togetherin the box below.  Not saying that this needs to be used to fix, it can be changed as need be, it just needs to flow right. The professor says that I did it incorrectly and I have one last chance to get this corrected. I have uploaded what I have.  To fix it he said.. 

 I don’t see your completed Gantt  chart with the changes  the assignment  requested, the milestones, and the Risk Assessment. You are to assume the role of Project Manager for a  company.  You are to hire a team and construct a survey to be sent to your company’s plant managers.  The purpose of the survey is to find out their needs for the upcoming year from the steel suppliers.  Specifically you are to ask them about cost, location, volume, and safety.  

Next you are to create a Gantt chart showing the milestone of the tasks that need to be accomplished.  If you added in hiring the people and creating the survey, I think your timeline would work.   

So….Basically I need this streamlined from what I did to make a proper internal assessment survey

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more